| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20076789 | Name of Scheme: RAJIPUR SVS | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 4578 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-May-2025 | Actual Date of Completion (Capex): 25-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 22.09 M / 84.46 M | RAJIPUR | 27.23243 | 79.64322 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 950 LPM / 61 M | RAJIPUR | 27.23243 | 79.64322 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 275 KL / 14 M | RAJIPUR | 27.23243 | 79.64322 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE / K-7 | 150 | .014 | COMPLETE |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 2.696 | COMPLETE |
| 2 | HDPE | 63 | 4.167 | COMPLETE |
| 3 | HDPE | 110 | .508 | COMPLETE |
| 4 | HDPE | 125 | .472 | COMPLETE |
| 5 | HDPE | 140 | .712 | COMPLETE |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 865 |