Project Completion Certificate (Ground Water)
Scheme ID: 20076657 Name of Scheme: ULDEYPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2511 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 07-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.26 Mtr / 90.13 Mtr ULDEYPUR 29.04874 77.742953
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 250 LPM / 50 Mtr ULDEYPUR 29.04874 77.742953
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75 Kl / 14 M ULDEYPUR 29.04874 77.742953
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.02790
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.716
2 HDPE 90 0.354
3 HDPE 110 0.162
HSC Connection
Sno. Total Nos.
1 550
Other Details
1.94
1.94
1.56
27-Dec-2024