Project Completion Certificate (Ground Water)
Scheme ID: 20075138 Name of Scheme: HUSAINPUR MUSALMAN No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 4300 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Aug-2024 Actual Date of Completion (Capex): 30-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 24/69.3 Husainpur Musalman 26º 26' 24.202" N 82º 50' 48.34" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 34.2/46 Husainpur Musalman 26º 26' 24.202" N 82º 50' 48.34" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC - Zink Alum Tank 175/14 Husainpur Musalman 26º 26' 24.202" N 82º 50' 48.34" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 9.989
2 HDPE Pipe PN-6: Class PE-100 75 1.349
3 HDPE Pipe PN-6: Class PE-100 90 2.396
4 HDPE Pipe PN-6: Class PE-100 125 1.167
5 HDPE Pipe PN-6: Class PE-100 140 1.359
6 HDPE Pipe PN-6: Class PE-100 180 0.149
HSC Connection
Sno. Total Nos.
1 134
Other Details
220.69
0.00
219.70
24-Dec-2026
05-Jan-2026