Project Completion Certificate (Ground Water)
Scheme ID: 20074526 Name of Scheme: RAMAPUR JASU MVS No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 5717 Base Year: 2023 Intermediate Year: 2028 Design Year: 2053
Date of Completion (As per Contract): 30-May-2025 Actual Date of Completion (Capex): 19-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 29.0 M / 117.31 M NAIGAWAN 27.51706 79.47469
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 PUMP 1150 LPM / 68 M NAIGAWAN 27.51706 79.47469
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325 KL / 16 M NAIGAWAN 27.51706 79.47469
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE / K-7 150 .019 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.292 COMPLETE
2 HDPE 63 9.660 COMPLETE
3 HDPE 110 .960 COMPLETE
4 HDPE 125 .382 COMPLETE
5 HDPE 140 1.111 COMPLETE
6 HDPE 160 .59 COMPLETE
7 HDPE 180 .216 COMPLETE
HSC Connection
Sno. Total Nos.
1 1053
Other Details
4.88
4.70
4.84
19-Jun-2024
20-Jun-2024