Project Completion Certificate (Ground Water)
Scheme ID: 20073569 Name of Scheme: CHIBARAMAU JJM No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2900 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 16-Dec-2025 Actual Date of Completion (Capex): 04-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 22 Mtr / 142.3 Mtr CHIBARAMAU 27.18709 80.338145
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.610 M³ per Min /45Mtr CHIBARAMAU 27.18709 80.338145
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 175 KL/ 12 Mtr CHIBARAMAU 27.187345 80.338035
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 150 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 3.607
2 HDPE Pipe PN-6, Class PE-100 75 1.173
3 HDPE Pipe PN-6, Class PE-100 90 1.670
4 HDPE Pipe PN-6, Class PE-100 110 0.021
5 HDPE Pipe PN-6, Class PE-100 125 0.262
6 HDPE Pipe PN-6, Class PE-100 140 0.200
7 HDPE Pipe PN-6, Class PE-100 160 0.417
HSC Connection
Sno. Total Nos.
1 265
Other Details
2.01
0.00
1.92
03-Oct-2026
04-Oct-2026