Project Completion Certificate (Ground Water)
Scheme ID: 20073274 Name of Scheme: RAMPUR KALA WSS No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 1580 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 28-Sep-2023 Actual Date of Completion (Capex): 01-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump 21/42 RAMPUR KALA 26º 17' 40.681" N 82º 46' 58.388" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 100/12 RAMPUR KALA 26º 17' 40.681" N 82º 46' 58.388" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 9.554
2 HDPE Pipe PN-6: Class PE-100 75 1.752
3 HDPE Pipe PN-6: Class PE-100 90 .020
4 HDPE Pipe PN-6: Class PE-100 110 0.372
HSC Connection
Sno. Total Nos.
1 280
Other Details
156.95
0.00
0.00
30-Nov-2025