Project Completion Certificate (Ground Water)
Scheme ID: 20072886 Name of Scheme: JANAPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 10
Total Population Covered: 3196 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Jul-2024 Actual Date of Completion (Capex): 07-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 6.0 JANAPUR JAMO 26.352175 81.565571
2 300 PLAIN PIPE 62.50 JANAPUR JAMO 26.352175 81.565571
3 300MM SLOTTED PIPE 23.00 JANAPUR JAMO 26.352175 81.565571
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 700 LPM / 54 MTR JANAPUR JAMO 26.352175 81.565571
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 200 KL / 16 MTR JANAPUR JAMO 26.352175 81.565571
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.0258
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 8.890
2 HDPE PIPE 63 7.074
3 HDPE PIPE 110 0.552
4 HDPE PIPE 125 1.392
5 HDPE PIPE 160 1.755
6 HDPE PIPE 180 1.045
HSC Connection
Sno. Total Nos.
1 527
Other Details
3.98
0.00
3.98
28-Sep-2024
15-Jan-2025