Project Completion Certificate (Ground Water)
Scheme ID: 20072858 Name of Scheme: Bikhipur, Keshawpur & Bisara Paschim GP water supply scheme No. of Villages: 5 No. of Habitation Covered: 11
Total Population Covered: 5896 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2024 Actual Date of Completion (Capex): 15-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 49.30 BHIKIPUR BAISARA PASCHIM 26.342846 81.779597
2 300MM PLAIN PIPE 101.5 BHIKIPUR BAISARA PASCHIM 26.342846 81.779597
3 150MM SLOTTED PIPE 15.00 BHIKIPUR BAISARA PASCHIM 26.342846 81.779597
4 300MM SLOTTED PIPE 33.00 BHIKIPUR BAISARA PASCHIM 26.342846 81.779597
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 625 LPM / 56 MTR BHIKIPUR BAISARA PASCHIM 26.342846 81.779597
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 350KL / 18MTR BHIKIPUR BAISARA PASCHIM 26.342846 81.779597
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 100 194.30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 4.77
2 HDPE PIPE 63 23.602
3 HDPE PIPE 110 1.348
4 HDPE PIPE 140 0.407
5 HDPE PIPE 160 1.257
6 HDPE PIPE 180 0.04
7 HDPE PIPE 200 2.012
HSC Connection
Sno. Total Nos.
1 946
Other Details
6.88
0.00
6.88
14-Sep-2024
30-Dec-2024