Project Completion Certificate (Ground Water)
Scheme ID: 20072767 Name of Scheme: MUBARAKHPUR & MIRAPUR WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 3251 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 25-Sep-2024 Actual Date of Completion (Capex): 07-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 150MM PLAIN PIPE 52.30 MUBARAKPUR MIRAPUR 26.449394 81.610462
2 300MM PLAIN PIPE 54 MUBARAKPUR MIRAPUR 26.449394 26.449394
3 150MM SLOTTED PIPE 07.00 MUBARAKPUR MIRAPUR 26.449394 26.449394
4 300MM SLOTTED PIPE 12.00 MUBARAKPUR MIRAPUR 26.449394 81.610462
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUMERSIBLE PUMP 700LPM / 52 MTR MUBARAKPUR MIRAPUR 26.449394 26.449394
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OVER HEAD TANK 200 KL / 14 MTR MUBARAKPUR MIRAPUR 26.449394 26.449394
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE 150 0.0068
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 90 4.613
2 HDPE PIPE 63 10.149
3 HDPE PIPE 110 0.492
4 HDPE PIPE 140 0.523
5 HDPE PIPE 160 0.172
HSC Connection
Sno. Total Nos.
1 560
Other Details
3.57
0.00
3.57
12-Dec-2024
15-Mar-2025