| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20071743 | Name of Scheme: BIBAN MAU VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 11 |
| Total Population Covered: 4178 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 21-Feb-2023 | Actual Date of Completion (Capex): 10-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300*150 | 21.06/213.19 | BIBAN MAU | 25.619637 | 82.754523 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 17.5HP | 900LPM/48m | BIBAN MAU | 25.619637 | 82.754523 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 250Kl/ 16m | BIBAN MAU | 25.619603 | 82.754484 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.0105 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 0.317 | Yes |
| 2 | HDPE | 75 | 4.586 | Yes |
| 3 | HDPE | 63 | 5.551 | Yes |
| 4 | HDPE | 110 | 1.229 | Yes |
| 5 | HDPE | 125 | 0.367 | Yes |
| 6 | HDPE | 140 | 0.184 | Yes |
| 7 | HDPE | 160 | .085 | Yes |
| 8 | HDPE | 180 | 0.054 | Yes |
| 9 | HDPE | 200 | 0.028 | Yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 417 |