Project Completion Certificate (Ground Water)
Scheme ID: 20071743 Name of Scheme: BIBAN MAU VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 11
Total Population Covered: 4178 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-Feb-2023 Actual Date of Completion (Capex): 10-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300*150 21.06/213.19 BIBAN MAU 25.619637 82.754523
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 17.5HP 900LPM/48m BIBAN MAU 25.619637 82.754523
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250Kl/ 16m BIBAN MAU 25.619603 82.754484
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0105 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.317 Yes
2 HDPE 75 4.586 Yes
3 HDPE 63 5.551 Yes
4 HDPE 110 1.229 Yes
5 HDPE 125 0.367 Yes
6 HDPE 140 0.184 Yes
7 HDPE 160 .085 Yes
8 HDPE 180 0.054 Yes
9 HDPE 200 0.028 Yes
HSC Connection
Sno. Total Nos.
1 417
Other Details
2.70
2.70
2.35
10-Oct-2024
10-Oct-2024