| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20071056 | Name of Scheme: DALHANPUR VILLAGE WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 8 |
| Total Population Covered: 2295 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Feb-2024 | Actual Date of Completion (Capex): 27-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200*150 | 14.5/61.66 | Dalhanpur | 25.813669 | 82.687566 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 10HP | 460M^3/43M | Dalhanpur | 25.813669 | 82.687566 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150KL/12M | Dalhanpur | 25.813719 | 82.687659 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 200 | 0.004 | Yes |
| 2 | DI K-7 | 100 | 0.019 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.63 | Yes |
| 2 | HDPE | 75 | 2.583 | Yes |
| 3 | HDPE | 63 | 5.169 | Yes |
| 4 | HDPE | 110 | 0.416 | Yes |
| 5 | HDPE | 140 | 0.451 | Yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 270 |