Project Completion Certificate (Ground Water)
Scheme ID: 20070886 Name of Scheme: MANDERIKA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2551 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 09-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 33/102.30 MANDERIKA 26.261621 81.870353
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 540 LPM/ 50 M MANDERIKA 26.261621 81.870353
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 150 KL / 12 M MANDERIKA 26.261621 81.870353
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 0.668
2 HDPE 110 0.545
3 HDPE 140 0.286
4 HDPE 63 8.107
5 HDPE 160 0.633
6 HDPE 180 0.184
HSC Connection
Sno. Total Nos.
1 422
Other Details
2.77
0.00
2.75
09-Sep-2024
10-Dec-2025