Project Completion Certificate (Ground Water)
Scheme ID: 20070873 Name of Scheme: SANSARPUR WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2352 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 20-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18/94.30 SANSARPUR 26.628367 81.589883
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 500 LPM/54M SANSARPUR 26.628367 81.589883
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 250 KL/16M SANSARPUR 26.628367 81.589883
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.022
2 HDPE 90 1.882
3 HDPE 110 1.392
4 HDPE 140 0.424
HSC Connection
Sno. Total Nos.
1 329
Other Details
2.86
0.00
2.83
20-May-2025
21-Aug-2025