Project Completion Certificate (Ground Water)
Scheme ID: 20070869 Name of Scheme: SENDURWA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 6715 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 02-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL-1 27.5/76.1 SENDURWA 26.912889 81.593850
2 TUBEWELL-2 26.58/72.5 SENDURWA 26.508730 81.596210
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE-1 725LPM/56M SENDURWA 26.912889 81.593850
2 SUBMERSIBLE-2 725LPM/56M SENDURWA 26.508730 81.596210
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 400 KL/18 M SENDURWA 26.912889 81.593850
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.63
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 12.416
2 HDPE 90 1.433
3 HDPE 110 1.135
4 HDPE 140 0.414
5 HDPE 160 0.122
6 HDPE 180 0.112
7 HDPE 200 0.256
8 DI K-7 200 1.554
9 DI K-7 250 0.763
HSC Connection
Sno. Total Nos.
1 549
Other Details
6.41
0.00
6.38
02-Apr-2025
03-Jul-2025