Project Completion Certificate (Ground Water)
Scheme ID: 20070865 Name of Scheme: HARGAON WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 10
Total Population Covered: 2562 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 13-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBWELL 50.19/16 HARGAON 26.386084 81.621647
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE -1 550/50 HARGAON 26.386084 81.621647
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 175/12 HARGAON 26.386084 81.621647
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.494
2 HDPE 90 5.043
3 HDPE 110 0.639
4 HDPE 125 0.000
5 HDPE 140 0.881
6 HDPE 160 0.452
HSC Connection
Sno. Total Nos.
1 426
Other Details
3.08
0.00
3.06
13-Sep-2024
14-Dec-2024