Project Completion Certificate (Ground Water)
Scheme ID: 20070249 Name of Scheme: KHANPUR PILAI WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 13
Total Population Covered: 3050 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 05-Feb-2024 Actual Date of Completion (Capex): 17-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 35.00/83.30 KHANPUR PILAI 26.17817 82.641426
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 640LPM/44M KHANPUR PILAI 26.17817 82.641426
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/12M KHANPUR PILAI 26.17817 82.641426
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 PE100 63 18.897
2 HDPE PN-6 PE100 75 4.020
3 HDPE PN-6 PE100 90 2.785
4 HDPE PN-6 PE100 110 0.720
5 HDPE PN-6 PE100 125 0.276
6 HDPE PN-6 PE100 140 0.745
7 HDPE PN-6 PE100 160 0.056
8 HDPE PN-6 PE100 180 0.062
HSC Connection
Sno. Total Nos.
1 480
Other Details
278.74
0.00
271.96
04-Jan-2026
13-Jul-2026