| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20070201 | Name of Scheme: MAWAR | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 3500 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2023 |
| Date of Completion (As per Contract): 20-Mar-2023 | Actual Date of Completion (Capex): 19-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 48.2/319.59 | MAWAR,JUNEDPUR | 26.306231 | 79.934414 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 540/70,530/70 | MAWAR,JUNEDPUR | 26.306231 | 79.934414 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/16 | MAWAR,JUNEDPUR | 26.306231 | 79.934414 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 6.416 | |
| 2 | HDPE PIPE | 75 | 0.667 | |
| 3 | HDPE PIPE | 90 | 0.085 | |
| 4 | HDPE PIPE | 110 | 0.674 | |
| 5 | HDPE PIPE | 125 | 0.498 | |
| 6 | HDPE PIPE | 140 | 0.040 | |
| 7 | HDPE PIPE | 160 | 0.225 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 665 |