Project Completion Certificate (Ground Water)
Scheme ID: 20070117 Name of Scheme: chiauna No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2870 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Mar-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18/226.56 Chiraura 26.432825 80.113637
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 50.70/61 Chiraura 26.432825 80.113637
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/16 Chiraura 26.432825 80.113637
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.02 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.95 As per Site
2 HDPE 75 0.843 As per Site
3 HDPE 90 0.393 As per Site
4 HDPE 125 0.140 As per Site
5 HDPE 140 0.094 As per Site
6 HDPE 160 0.530 As per Site
HSC Connection
Sno. Total Nos.
1 590
Other Details
2.63
2.63
2.63
31-May-2024
01-Jun-2024