| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20069122 | Name of Scheme: SHAHMAU VILLAGE WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 10 |
| Total Population Covered: 2178 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Feb-2024 | Actual Date of Completion (Capex): 16-Jan-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 | 6.03m/47.22m | Shahmau | 26.063118 | 82.494212 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 7.5HP | 426LPM/43m | Shahmau | 26.063118 | 82.494212 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 125KL/12m | Shahmau | 26.063301 | 82.494426 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.01785 | Yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 1.823 | Yes |
| 2 | HDPE | 75 | 2.234 | Yes |
| 3 | HDPE | 63 | 3.394 | Yes |
| 4 | HDPE | 110 | 0.756 | Yes |
| 5 | HDPE | 140 | 0.635 | Yes |
| 6 | HDPE | 160 | 0.573 | Yes |
| 7 | HDPE | 180 | 0.402 | Yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 286 |