Project Completion Certificate (Ground Water)
Scheme ID: 20069122 Name of Scheme: SHAHMAU VILLAGE WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 10
Total Population Covered: 2178 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Feb-2024 Actual Date of Completion (Capex): 16-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 300 6.03m/47.22m Shahmau 26.063118 82.494212
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 7.5HP 426LPM/43m Shahmau 26.063118 82.494212
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125KL/12m Shahmau 26.063301 82.494426
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.01785 Yes
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 1.823 Yes
2 HDPE 75 2.234 Yes
3 HDPE 63 3.394 Yes
4 HDPE 110 0.756 Yes
5 HDPE 140 0.635 Yes
6 HDPE 160 0.573 Yes
7 HDPE 180 0.402 Yes
HSC Connection
Sno. Total Nos.
1 286
Other Details
1.71
1.71
1.66
16-Jan-2026