| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20068693 | Name of Scheme: BHEEKANPUR SHUMALI & CHHOYA MVS (O) | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3941 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 31-Dec-2027 | Actual Date of Completion (Capex): 25-Mar-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Solar Powered Pump | 30.14/107.38 | Bheekanpur Sumali | 28.81062098 | 78.26407855 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Powered | 840/45 | Bheekanpur Sumali | 28.81062098 | 78.26407855 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Cast in situ Zinc Zincalume | 250/14 | Bheekanpur Sumali | 28.81055129 | 78.26419221 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7/DI | 150 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6 PE100/HDPE | 90 | 0.39740 | |
| 2 | PN-6 PE100/HDPE | 75 | 0.3277 | |
| 3 | PN-6 PE100/HDPE | 63 | 5.5826 | |
| 4 | PN-6 PE100/HDPE | 110 | 0.1465 | |
| 5 | PN-6 PE100/HDPE | 125 | 0.0983 | |
| 6 | PN-6 PE100/HDPE | 140 | 0.4447 | |
| 7 | PN-6 PE100/HDPE | 160 | 0.1455 | |
| 8 | PN-6 PE100/HDPE | 180 | 0.1098 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 682 |