| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20068622 | Name of Scheme: Baharaicha | No. of Villages: 6 | No. of Habitation Covered: 10 |
| Total Population Covered: 4364 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2024 | Actual Date of Completion (Capex): 13-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -1 | 27.07/169.80 | Baharaicha | 25.662381 | 82.564048 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-1 | 900/47.50 | Baharaicha | 25.662381 | 82.564048 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 250/12 | Baharaicha | 25.662276 | 82.564188 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 200 | 0.0147 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 200 | 0.543 | |
| 2 | HDPE PIPE PN-6 | 160 | 0.321 | |
| 3 | HDPE PIPE PN-6 | 140 | 0.031 | |
| 4 | HDPE PIPE PN-6 | 110 | 0.937 | |
| 5 | HDPE PIPE PN-6 | 90 | 2.15 | |
| 6 | HDPE PIPE PN-6 | 75 | 2.23 | |
| 7 | HDPE PIPE PN-6 | 63 | 18.36 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 565 |