Project Completion Certificate (Ground Water)
Scheme ID: 20068389 Name of Scheme: BHARETHA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 13
Total Population Covered: 4327 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 21-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 11.32/85.49 BHARETHA 26.133436 81.868580
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 910/52 BHARETHA 26.133436 81.868580
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275/14 BHARETHA 26.133436 81.868580
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0246
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 12.061
2 HDPE 90 4.441
3 HDPE 110 1.709
4 HDPE 140 2.156
5 HDPE 160 1.108
6 HDPE 180 0.264
HSC Connection
Sno. Total Nos.
1 430
Other Details
4.61
0.00
4.57
21-May-2025
22-Aug-2025