Project Completion Certificate (Ground Water)
Scheme ID: 20068328 Name of Scheme: MATHA BHUSUNDA WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 3561 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 27-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 26.09/109.77 MATHA BHUSUNDA 26.397916 81.775206
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 740/52 MATHA BHUSUNDA 26.397916 81.775206
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225/14 MATHA BHUSUNDA 26.397916 81.775206
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.234
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.417
2 HDPE 90 3.567
3 HDPE 110 0.382
4 HDPE 125 0.304
5 HDPE 140 2.057
6 HDPE 160 0.164
HSC Connection
Sno. Total Nos.
1 689
Other Details
3.42
0.00
3.39
27-May-2025
28-Aug-2025