| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20068082 | Name of Scheme: KISHUNI WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 7071 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 09-Jan-2024 | Actual Date of Completion (Capex): 19-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL-1 | 20.08/94.12 | KISHUNI | 26.584584 | 81.664660 |
| 2 | TUBEWELL-2 | 20/96.12 | KISHUNI | 26.587505 | 81.644550 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE-1 | 700 LPM/56M | KISHUNI | 26.584584 | 81.664660 |
| 2 | SUBMERSIBLE-2 | 700 LPM/56M | KISHUNI | 26.587505 | 81.644550 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 400KL/18 M | KISHUNI | 26.584584 | 81.664660 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.798 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 9.279 | |
| 2 | HDPE | 90 | 6.876 | |
| 3 | HDPE | 110 | 1.837 | |
| 4 | HDPE | 125 | 0.165 | |
| 5 | HDPE | 140 | 0.839 | |
| 6 | HDPE | 180 | 0.241 | |
| 7 | HDPE | 200 | 0.275 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1398 |