Project Completion Certificate (Ground Water)
Scheme ID: 20068027 Name of Scheme: SONARI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 19
Total Population Covered: 7070 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 06-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL -1 17.8/64.54 SONARI 26.107841 81.990224
2 TUBEWELL-2 18.24/64 SONARI 26.105657 81.991133
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 750 LPM/56M SONARI 26.107841 81.990224
2 SUBMERSIBLE- 2 750LPM/56M SONARI 26.105657 81.991133
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 425KL/18M SONARI 26.107841 81.990224
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.4856
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 22.378
2 HDPE 90 4.606
3 HDPE 110 2.251
4 HDPE 140 2.761
5 HDPE 180 0.160
6 HDPE 200 1.220
HSC Connection
Sno. Total Nos.
1 824
Other Details
6.98
0.00
6.95
06-May-2025
07-Aug-2025