Project Completion Certificate (Ground Water)
Scheme ID: 20067964 Name of Scheme: SARAIYA BADGAON & MISHRAULI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 9
Total Population Covered: 3151 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 08-Feb-2024 Actual Date of Completion (Capex): 10-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 12/80 M SARAIYA BADGAON & MISHRAULI 26.057528 81.771718
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 660 LPM/ 52M SARAIYA BADGAON & MISHRAULI 26.057528 81.771718
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 200 KL/ 14 SARAIYA BADGAON & MISHRAULI 26.057528 81.771718
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.0245
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 90 3.285
2 HDPE 110 0.860
3 HDPE 140 0.427
4 HDPE 160 0.394
5 HDPE 180 0.634
6 HDPE 63 13.555
HSC Connection
Sno. Total Nos.
1 683
Other Details
3.85
0.00
3.81
10-May-2025
11-Aug-2025