| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067918 | Name of Scheme: KHARUWAIYA Water Supply Scheme | No. of Villages: 3 | No. of Habitation Covered: 10 |
| Total Population Covered: 3220 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 10-Mar-2024 | Actual Date of Completion (Capex): 15-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of borewell Assembly | 76.86M / 24.11M | Kharuwaiyan | 26.353488 | 83.046597 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.5 HP Submersible Pump | 650LPM/44M | Kharuwaiyan | 26.353488 | 83.046597 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 200KL/14MTR | Kharuwaiyan | 26.353488 | 83.046597 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | 0.04 | 0.04 |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.786 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 2.965 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 63 | 9.598 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 140 | 1.536 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.035 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 376 |