| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067799 | Name of Scheme: PURALAL Village water supply scheme | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 1790 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2058 |
| Date of Completion (As per Contract): 23-Mar-2024 | Actual Date of Completion (Capex): 18-Jan-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 300 m | 9 m/45 m | Puralal | 25.899307 | 82.388327 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 7.5 HP | 380 LPM/43 M | Puralal | 25.899307 | 82.388327 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100 kl /12 m | Puralal | 25.899298 | 82.38838 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI, K-7 | 100 | 0.0169 | yes |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | .321 | yes |
| 2 | HDPE | 75 | 2.097 | yes |
| 3 | HDPE | 63 | 4.762 | yes |
| 4 | HDPE | 110 | 0.095 | yes |
| 5 | HDPE | 140 | 0.466 | yes |
| 6 | HDPE | 160 | 0.331 | yes |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 229 |