Project Completion Certificate (Ground Water)
Scheme ID: 20067418 Name of Scheme: TARA KHURD Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 11
Total Population Covered: 6690 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 15-Mar-2024 Actual Date of Completion (Capex): 22-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering & Tubewwll assembly 27/108 TARAKHURD 26.311396 82.566428
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submercible pumping plant 25HP 1400/46 TARAKHURD 26.311 82.56
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC STRUCTURE 400/16 TARAKHURD 26.31 82.566
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 200 0.032
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 2.189
2 HDPE Pipe PN-6: Class PE-100 75 1.348
3 HDPE Pipe PN-6: Class PE-100 63 29.111
4 HDPE Pipe PN-6: Class PE-100 110 1.886
5 HDPE Pipe PN-6: Class PE-100 140 1.334
6 HDPE Pipe PN-6: Class PE-100 160 1.510
7 HDPE Pipe PN-6: Class PE-100 200 0.743
HSC Connection
Sno. Total Nos.
1 1019
Other Details
4.67
4.67
4.67
22-Jun-2026
23-Jun-2026