Project Completion Certificate (Ground Water)
Scheme ID: 20067258 Name of Scheme: HATHOOMA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2680 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 13-Jan-2023 Actual Date of Completion (Capex): 12-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/310.50 HATHOOMA 26.269928 79.699422
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 560/70 HATHOOMA 26.269928 79.699422
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/14 HATHOOMA 26.269928 79.699422
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 4.740
2 HDPE PIPE 75 0.850
3 HDPE PIPE 90 0.166
4 HDPE PIPE 110 0.113
5 HDPE PIPE 125 0.214
6 HDPE PIPE 140 0.169
7 HDPE PIPE 160 1.134
HSC Connection
Sno. Total Nos.
1 846
Other Details
2.02
0.00
2.45
04-Jul-2025
05-Jul-2025