Project Completion Certificate (Ground Water)
Scheme ID: 20067124 Name of Scheme: BARKHEDA SADAT SINGLE WATER SUPPLY SCHEME (O) No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2541 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 10-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.02/88.89 Barkhera Sadat 28.949683 78.405536
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 534/44 Barkhera Sadat 28.949683 78.405536
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Cast in situ Zinc Zincalume 150/12 Barkhera Sadat 28.949609 78.405684
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7/DI 100 0.0266
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 90 0.9396
2 PN-6 PE100/HDPE 75 0.2092
3 PN-6 PE100/HDPE 63 5.3382
4 PN-6 PE100/HDPE 110 0.3773
5 PN-6 PE100/HDPE 125 0.017
6 PN-6 PE100/HDPE 140 0.4204
HSC Connection
Sno. Total Nos.
1 541
Other Details
1.94
0.00
1.92
30-Sep-2025
01-Oct-2025