| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20067110 | Name of Scheme: MUDAINAVADA &JUDUPUR & RANKEDIH GRAM PANCHAYAT WATER SUPPLY SCHEME | No. of Villages: 4 | No. of Habitation Covered: 13 |
| Total Population Covered: 15870 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 18-Jul-2024 | Actual Date of Completion (Capex): 08-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell-1&2 | 65.98 M /292.72 M | Mudainavada,judupur & rankhedi | 26.287122 | 81.9672 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump-1&2 | 920 & 1190 LPM /50 M | Mudainavada,judupur & rankhedi | 26.287122 | 81.9672 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1&2 | 350 & 275 KL / 18 & 16 M | Mudainavada,judupur & rankhedi | 26.287122 | 81.9672 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI /K7 | 125 | 0.017 | |
| 2 | DI /K7 | 150 | 0.017 | |
| 3 | DI /K7 | 200 | 0.044 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE /PN-6:Class PE-100 | 63 | 33.008 | |
| 2 | HDPE /PN-6:Class PE-100 | 75 | 4.705 | |
| 3 | HDPE /PN-6:Class PE-100 | 90 | 4.07 | |
| 4 | HDPE /PN-6:Class PE-100 | 110 | 2.824 | |
| 5 | HDPE /PN-6:Class PE-100 | 125 | 2.412 | |
| 6 | HDPE /PN-6:Class PE-100 | 140 | 3.447 | |
| 7 | HDPE /PN-6:Class PE-100 | 160 | 0.696 | |
| 8 | HDPE /PN-6:Class PE-100 | 180 | 0.335 | |
| 9 | HDPE /PN-6:Class PE-100 | 200 | 0.063 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1735 |