Project Completion Certificate (Ground Water)
Scheme ID: 20066834 Name of Scheme: DILAULIYA BANGAR No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 2551 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 13-Jan-2023 Actual Date of Completion (Capex): 12-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/126.54 DILAULIYA BANGER 26.217800 79.972711
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 530/72 DILAULIYA BANGER 26.217800 79.972711
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/16 DILAULIYA BANGER 26.217800 79.972711
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.025
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 6.907
2 HDPE PIPE 75 0.436
3 HDPE PIPE 90 0.212
4 HDPE PIPE 110 2.004
5 HDPE PIPE 125 0.505
6 HDPE PIPE 140 0.404
7 HDPE PIPE 160 0.057
HSC Connection
Sno. Total Nos.
1 574
Other Details
1.93
0.00
2.38
14-Jul-2025
15-Jul-2025