Scheme ID: 20066802 Name of Scheme: GAGUAL REORGANISATION No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 8897 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 11-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 42.24 Mtr / 77.95 Mtr GAGAUL 28.908249 77.697356
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 750 LPM / 50 Mtr GAGAUL 28.908249 77.697356
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 Kl / 16 M GAGAUL 28.908249 77.697356
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0233
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 10.292
2 HDPE 90 1.738
3 HDPE 110 0.729
4 HDPE 125 0.452
5 HDPE 140 0.493
6 HDPE 160 0.081
HSC Connection
Sno. Total Nos.
Other Details
3.68
3.68