Project Completion Certificate (Ground Water)
Scheme ID: 20066723 Name of Scheme: Gauriyapur No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1642 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 13-Jan-2023 Actual Date of Completion (Capex): 12-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18/146.50 GAURIYAPUR 26.362578 79.876986
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 400/68 GAURIYAPUR 26.362578 79.876986
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 GAURIYAPUR 26.362578 79.876986
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 2.452
2 HDPE PIPE 75 0.535
3 HDPE PIPE 90 0.473
4 HDPE PIPE 110 0.122
5 HDPE PIPE 125 0.049
6 HDPE PIPE 140 0.053
HSC Connection
Sno. Total Nos.
1 289
Other Details
1.50
0.00
1.68
31-Dec-2025
01-Jan-2026