Project Completion Certificate (Ground Water)
Scheme ID: 20066684 Name of Scheme: PUREPAWAR & MITHNEPUR GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 6 No. of Habitation Covered: 14
Total Population Covered: 9540 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 23-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell-1&2 55.02 M / 291.10 M Purepawar & Mithnepur 26.364917 82.892799
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 635 LPM / 50 M Purepawar & Mithnepur 26.364917 82.892799
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 350 KL / 16 M Purepawar & Mithnepur 26.364917 82.892799
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 125 1.002
2 DI / K7 200 0.089
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6: Class PE-100 63 23.578
2 HDPE / PN-6: Class PE-100 75 1.763
3 HDPE / PN-6: Class PE-100 90 3.828
4 HDPE / PN-6: Class PE-100 110 2.68
5 HDPE / PN-6: Class PE-100 125 0.444
6 HDPE / PN-6: Class PE-100 140 1.14
7 HDPE / PN-6: Class PE-100 160 0.169
8 HDPE / PN-6: Class PE-100 180 0.948
9 HDPE / PN-6: Class PE-100 200 0.393
HSC Connection
Sno. Total Nos.
1 1308
Other Details
5.53
0.00
5.64
27-May-2025
01-Jul-2025