| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066603 | Name of Scheme: PALI WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 8 |
| Total Population Covered: 5136 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 11-Dec-2023 | Actual Date of Completion (Capex): 26-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL-1 | 27.3/96.5 | PALI | 26.623405 | 81.6393316 |
| 2 | TUBEWELL-2 | 27.79/86.79 | PALI | 26.622425 | 81.642720 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE -1 | 525 LPM/ 56 M | PALI | 26.623405 | 81.6393316 |
| 2 | SUBMERSIBLE -2 | 525 LPM/ 56M | PALI | 26.622425 | 81.642720 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 300 KL/ 18 M | PALI | 26.623405 | 81.6393316 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.459 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 13.367 | |
| 2 | HDPE | 90 | 5.872 | |
| 3 | HDPE | 110 | 1.895 | |
| 4 | HDPE | 140 | 2.335 | |
| 5 | HDPE | 160 | 0.567 | |
| 6 | HDPE | 180 | 1.244 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 984 |