Project Completion Certificate (Ground Water)
Scheme ID: 20066603 Name of Scheme: PALI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 8
Total Population Covered: 5136 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 11-Dec-2023 Actual Date of Completion (Capex): 26-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL-1 27.3/96.5 PALI 26.623405 81.6393316
2 TUBEWELL-2 27.79/86.79 PALI 26.622425 81.642720
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE -1 525 LPM/ 56 M PALI 26.623405 81.6393316
2 SUBMERSIBLE -2 525 LPM/ 56M PALI 26.622425 81.642720
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 300 KL/ 18 M PALI 26.623405 81.6393316
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.459
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 13.367
2 HDPE 90 5.872
3 HDPE 110 1.895
4 HDPE 140 2.335
5 HDPE 160 0.567
6 HDPE 180 1.244
HSC Connection
Sno. Total Nos.
1 984
Other Details
4.93
0.00
4.91
26-Mar-2025
27-Jun-2025