| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066540 | Name of Scheme: BHADMER VILLAGE WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 10 |
| Total Population Covered: 3261 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 11-Dec-2023 | Actual Date of Completion (Capex): 24-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 14.08/81.56 | BHADMER | 26.391800 | 81.410200 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 700 LPM/52 M | BHADMER | 26.391800 | 81.410200 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 200 KL/14 M | BHADMER | 26.391800 | 81.410200 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.027 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.059 | |
| 2 | HDPE | 90 | 5.492 | |
| 3 | HDPE | 110 | 1.661 | |
| 4 | HDPE | 140 | 1.182 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 359 |