| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066479 | Name of Scheme: NAGAHTI | No. of Villages: 5 | No. of Habitation Covered: 20 |
| Total Population Covered: 5331 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2024 | Actual Date of Completion (Capex): 28-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -1 | 12/48.50 | NAGAHATI | 25.89205 | 82.604904 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump -1 | 1100/51.30 | NAGAHATI | 25.89205 | 82.604904 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 300/16 | NAGAHATI | 25.891889 | 82.604821 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 200 | 0.019 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 200 | 0.087 | |
| 2 | HDPE PIPE PN-6 | 160 | 0.510 | |
| 3 | HDPE PIPE PN-6 | 140 | 2.106 | |
| 4 | HDPE PIPE PN-6 | 110 | 0.951 | |
| 5 | HDPE PIPE PN-6 | 90 | 2.426 | |
| 6 | HDPE PIPE PN-6 | 75 | 1.33 | |
| 7 | HDPE PIPE PN-6 | 63 | 24.72 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 784 |