Project Completion Certificate (Ground Water)
Scheme ID: 20066469 Name of Scheme: ITRAUR & TETARPUR& HASAWA SUKHANPUR WATER SUPPLY SCHEME No. of Villages: 3 No. of Habitation Covered: 15
Total Population Covered: 6416 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 12-May-2024 Actual Date of Completion (Capex): 14-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBWELL -1 73.28/19.51 ITRAUR & TETARPUR& HASAWA SUKHANPUR WATER SUPPLY SCHEME 26.424924 81.606853
2 TUBWELL -2 79.28/21.6 ITRAUR & TETARPUR& HASAWA SUKHANPUR WATER SUPPLY SCHEME 26.433520 81.609770
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE -1 675 /56 ITRAUR & TETARPUR& HASAWA SUKHANPUR WATER SUPPLY SCHEME 26.424924 81.606853
2 SUBMERSIBLE -2 675 /56 ITRAUR & TETARPUR& HASAWA SUKHANPUR WATER SUPPLY SCHEME 26.433520 81.609770
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 400/18 ITRAUR & TETARPUR& HASAWA SUKHANPUR WATER SUPPLY SCHEME 26.424924 81.606853
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 150 0.535
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 13.061
2 HDPE 90 6.365
3 HDPE 110 1.649
4 HDPE 125 1.423
5 HDPE 140 0.312
6 HDPE 160 2.013
7 HDPE 180 0.888
8 HDPE 200 1.533
HSC Connection
Sno. Total Nos.
1 1140
Other Details
6.95
0.00
6.89
14-Sep-2024
15-Dec-2024