| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20066194 | Name of Scheme: Jairampwur | No. of Villages: 5 | No. of Habitation Covered: 14 |
| Total Population Covered: 3880 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 26-Jul-2024 | Actual Date of Completion (Capex): 24-Aug-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well -300X200 | 30.09/161.78 | Jairampwur | 25.577512 | 82.652009 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Pump-17.5HP | 800/53.30 | Jairampwur | 25.577512 | 82.652009 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 225KL-18M | Jairampwur | 25.577417 | 82.651758 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 150 | 0.02 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 160 | 1.890 | |
| 2 | HDPE PIPE PN-6 | 140 | 1.309 | |
| 3 | HDPE PIPE PN-6 | 110 | 0.404 | |
| 4 | HDPE PIPE PN-6 | 90 | 0.243 | |
| 5 | HDPE PIPE PN-6 | 75 | 0.633 | |
| 6 | HDPE PIPE PN-6 | 63 | 10.920 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 486 |