| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20065977 | Name of Scheme: MAU ATWARA WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 7 |
| Total Population Covered: 5369 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 04-Aug-2024 | Actual Date of Completion (Capex): 16-Jun-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 150MM PLAIN PIPE | 20.5 | MAU ATWARA | 26.502867 | 81.688064 |
| 2 | 200MM PLAIN PIPE | 126.5 | MAU ATWARA | 26.502867 | 81.688064 |
| 3 | 150MM SLOTTED PIPE | 12.00 | MAU ATWARA | 26.502867 | 81.688064 |
| 4 | 200MM SLOTTED PIPE | 34.00 | MAU ATWARA | 26.502867 | 81.688064 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUMERSIBLE PUMP | 575LPM / 52MTR | MAU ATWARA | 26.502867 | 81.688064 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVER HEAD TANK | 325 KL / 14 MTR | MAU ATWARA | 26.502867 | 81.688064 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE | 100 | 0.741 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 90 | 5.184 | |
| 2 | HDPE PIPE | 63 | 10.913 | |
| 3 | HDPE PIPE | 110 | 2.488 | |
| 4 | HDPE PIPE | 125 | 1.239 | |
| 5 | 1.239 | 140 | 1.417 | |
| 6 | 1.239 | 160 | 0.363 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1022 |