Project Completion Certificate (Ground Water)
Scheme ID: 20064398 Name of Scheme: PACHDEORA PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2585 Base Year: 2023 Intermediate Year: 0 Design Year: 0
Date of Completion (As per Contract): 06-Jan-2022 Actual Date of Completion (Capex): 27-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18.12 m / 100 m pachdeora 26.55225 79.269722
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 400 LPM / 51 Head pachdeora 26.55225 79.269722
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 oht 100 kl /14 m pachdeora 26.55225 79.269722
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 di pipe 100 0.0144
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.9973
2 HDPE 90 1.9433
3 HDPE 110 1.963
4 HDPE 125 0.840
5 HDPE 140 0.178
HSC Connection
Sno. Total Nos.
1 434
Other Details
2.14
0.00
2.19
21-Apr-2024
27-Jun-2024