| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20064259 | Name of Scheme: BARKHAGAWAN KANNAUJ GRAMIN PEYJAL YOJNA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1390 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 06-Jun-2024 | Actual Date of Completion (Capex): 24-Apr-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | 200 mm Dia Plain Pipe | 55.5 | Barkagawn | 27.123441 | 79.841313 |
| 2 | 200 mm Dia Slotted Pipe | 9 | Barkagawn | 27.123441 | 79.841313 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 300/65 | Barkagawn | 27.123441 | 79.841313 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Zn-Al Tank | 100KL/16Mtr. | Barkagawn | 27.123441 | 79.841313 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe | 80 | 0.008 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | Distribution Pipe/HDPE | 63 | 1.801 | |
| 2 | Distribution Pipe/HDPE | 75 | 0.287 | |
| 3 | Distribution Pipe/HDPE | 90 | 0.100 | |
| 4 | Distribution Pipe/HDPE | 125 | 0.759 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 245 |