Project Completion Certificate (Ground Water)
Scheme ID: 20064126 Name of Scheme: Pur No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 3000 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 12-Jan-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 26.96/156.78 Pur 26.44535822 79.9141462
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 52.10/67 Pur 26.44535822 79.9141462
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/16 Pur 26.44535822 79.9141462
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.015 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.064 As per Site
2 HDPE 75 0.681 As per Site
3 HDPE 90 0.397 As per Site
4 HDPE 110 1.155 As per Site
5 HDPE 140 0.520 As per Site
6 HDPE 160 0.731 As per Site
7 HDPE 180 1.022 As per Site
HSC Connection
Sno. Total Nos.
Other Details
2.32
2.31
2.31
30-Sep-2023
01-Oct-2023