Scheme ID: 20063805 Name of Scheme: Gangauli No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 4150 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 11-Jan-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.800 As per Site
2 HDPE 75 3.752 As per Site
3 HDPE 90 1.4040 As per Site
4 HDPE 110 0.8750 As per Site
5 HDPE 140 2.1720 As per Site
6 HDPE 160 1.2080 As per Site
7 HDPE 180 0.7840 As per Site
8 HDPE 200 0.949 As per Site
HSC Connection
Sno. Total Nos.
1 830
Other Details
3.69
3.69
3.69
31-Dec-2023