| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20062642 | Name of Scheme: DANPUR Water supply scheme | No. of Villages: 6 | No. of Habitation Covered: 8 |
| Total Population Covered: 3440 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 17-Jan-2024 | Actual Date of Completion (Capex): 08-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Tubewell Assembly | 27.06/114.78 | DANPUR JIGNA | 26.584838 | 82.554223 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Ac Submersible Pump 12.5 HP | 0.73/44 | DANPUR JIGNA | 26.584838 | 82.554223 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 225KL/14M | DANPUR JIGNA | 26.584838 | 82.554223 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 200 | 0.18 | |
| 2 | DI-K7 | 150 | 0.20 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6:Class PE-100 | 90 | 1.16 | |
| 2 | HDPE Pipe PN-6:Class PE-100 | 75 | 1.87 | |
| 3 | HDPE Pipe PN-6:Class PE-100 | 63 | 12.24 | |
| 4 | HDPE Pipe PN-6:Class PE-100 | 110 | 2.17 | |
| 5 | HDPE Pipe PN-6:Class PE-100 | 125 | 0.24 | |
| 6 | HDPE Pipe PN-6:Class PE-100 | 140 | 0.24 | |
| 7 | HDPE Pipe PN-6:Class PE-100 | 160 | 0.57 | |
| 8 | HDPE Pipe PN-6:Class PE-100 | 180 | 0.02 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 568 |