| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20062533 | Name of Scheme: SINGHPUR WSS | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 1780 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Dec-2023 | Actual Date of Completion (Capex): 24-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 18 /68.3 | Bhiti | 26º 28' 42.988" N | 82º 52' 30.692" E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VTPump | 24/43 | Bhiti | 26º 28' 42.988" N | 82º 52' 30.692" E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC-Zink Aaum Tank | 100/12 | Bhiti | 26º 28' 42.988" N | 82º 52' 30.692" E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 100 | 0.040 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 4.45 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.244 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.719 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.269 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.260 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.550 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.387 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 240 |