Project Completion Certificate (Ground Water)
Scheme ID: 20061497 Name of Scheme: Jalpura1 No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2100 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Nov-2022 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 21/139.88 Jalpura 26.176984 79.79560
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 33.80/68 Jalpura 26.176984 79.79560
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/15 Jalpura 26.176984 79.79560
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.025 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.80 As per Site
2 HDPE 90 0.43 As per Site
3 HDPE 110 0.79 As per Site
4 HDPE 125 0.65 As per Site
5 HDPE 140 0.05 As per Site
HSC Connection
Sno. Total Nos.
1 370
Other Details
1.73
2.32
2.32
31-Mar-2024
01-Apr-2024