Project Completion Certificate (Ground Water)
Scheme ID: 20060216 Name of Scheme: Kudaina WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1848 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Aug-2024 Actual Date of Completion (Capex): 12-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 18 M/94.92 M Kudaina 28.433245 77.901353
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 380 LPM/44 M Kudaina 28.433245 77.901353
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 125 KL/22 M Kudaina 28.433381 7.901374
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.027
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.68
2 HDPE 75 0.49
3 HDPE 90 0.11
4 HDPE 110 0.032
5 HDPE 140 0.17
HSC Connection
Sno. Total Nos.
1 445
Other Details
1.60
1.58
1.62
22-Nov-2025
23-Nov-2025