| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20060216 | Name of Scheme: Kudaina WSS | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1848 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Aug-2024 | Actual Date of Completion (Capex): 12-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 18 M/94.92 M | Kudaina | 28.433245 | 77.901353 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 380 LPM/44 M | Kudaina | 28.433245 | 77.901353 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125 KL/22 M | Kudaina | 28.433381 | 7.901374 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 100 | 0.027 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.68 | |
| 2 | HDPE | 75 | 0.49 | |
| 3 | HDPE | 90 | 0.11 | |
| 4 | HDPE | 110 | 0.032 | |
| 5 | HDPE | 140 | 0.17 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 445 |